{"id":52,"date":"2012-11-28T19:06:56","date_gmt":"2012-11-28T19:06:56","guid":{"rendered":"http:\/\/gvz-ffo\/?page_id=52"},"modified":"2019-03-07T14:10:59","modified_gmt":"2019-03-07T13:10:59","slug":"historie","status":"publish","type":"page","link":"https:\/\/www.gvz-ffo.de\/en\/schiene\/historie\/","title":{"rendered":"A strong past"},"content":{"rendered":"<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"87%\">\n<p class=\"ueber\">23.10.1842<\/p>\n<p>Opening of the 81 km long single track, Berlin &#8211; Frankfurt (Oder) rail route for passenger traffic<\/td>\n<td rowspan=\"14\" valign=\"top\" width=\"13%\"><a ref=\"magnificPopup\" href=\"https:\/\/www.gvz-ffo.de\/wp-content\/uploads\/image_historie_1929.jpg\" rel=\"prettyPhoto\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright border\" src=\"https:\/\/www.gvz-ffo.de\/wp-content\/uploads\/thumb_historie_1929.jpg\" alt=\"\" width=\"180\" height=\"180\" border=\"0\" \/><\/a><\/p>\n<div style=\"clear: both;\"><\/div>\n<p><a ref=\"magnificPopup\" href=\"https:\/\/www.gvz-ffo.de\/wp-content\/uploads\/image_historie_1965.jpg\" rel=\"prettyPhoto\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright border\" src=\"https:\/\/www.gvz-ffo.de\/wp-content\/uploads\/thumb_historie_1965.jpg\" alt=\"\" width=\"180\" height=\"180\" border=\"0\" \/><\/a><\/p>\n<div style=\"clear: both;\"><\/div>\n<p><a ref=\"magnificPopup\" href=\"https:\/\/www.gvz-ffo.de\/wp-content\/uploads\/image_historie_1979.jpg\" rel=\"prettyPhoto\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright border\" src=\"https:\/\/www.gvz-ffo.de\/wp-content\/uploads\/thumb_historie_1979.jpg\" alt=\"\" width=\"180\" height=\"180\" border=\"0\" \/><\/a><\/p>\n<div style=\"clear: both;\"><\/div>\n<p>&nbsp;<\/p>\n<p><a title=\"KV-Terminal Einweihung\" ref=\"magnificPopup\" href=\"https:\/\/www.gvz-ffo.de\/wp-content\/uploads\/image_historie_kv-terminal_einweihung.jpg\" rel=\"prettyPhoto\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright border\" src=\"https:\/\/www.gvz-ffo.de\/wp-content\/uploads\/thumb_historie_kv-terminal_einweihung.jpg\" alt=\"\" width=\"180\" height=\"180\" border=\"0\" \/><\/a><\/p>\n<div style=\"clear: both;\"><\/div>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright border\" title=\"KV-Terminal Einweihung - \u00f6stliche Gleisanbindung\" src=\"https:\/\/www.gvz-ffo.de\/wp-content\/uploads\/thumb_historie_kv-terminal_ost_anbindung.jpg\" alt=\"\" width=\"180\" height=\"180\" border=\"0\" \/><\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">31.10.1842<\/p>\n<p>Opening of the Berlin &#8211; Frankfurt (Oder) rail route for freight transport<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">02.01.1857<\/p>\n<p>Commissioning of the &#8220;Central Workshop,&#8217; later named Main Workshop in Frankfurt (Oder)<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">01.04.1910<\/p>\n<p>Start of preliminary work for the construction of the switching yard (later marshalling yard). In particular, the marshalling yard took on an important role in cross-border transport to Eastern Europe.<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">01.06.1917<\/p>\n<p>Opening of the Depot with room for 36 locomotives<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">08.05.1945<\/p>\n<p>The rail route between Frankfurt (Oder) and Berlin is switched to broad gauge tracks thus enabling standard and broad gauge traffic.<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">02.09.1945<\/p>\n<p>One pair of trains travels daily on the standard gauge between Frankfurt (Oder) and Berlin. The journey takes 3.5 hours.<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">23.05.1954<\/p>\n<p>Commissioning of the Frankfurt (Oder) Border Train Station<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">27.01.1970<\/p>\n<p>First container train from Berlin &#8211; Warsaw via Frankfurt (Oder)<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">03.05.2001<\/p>\n<p>The FGL hump control tower in the Frankfurt (Oder) marshalling yard is torn down to make room for the construction of the Intermodal Terminal.<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">31.05.2003<\/p>\n<p>The Intermodal Terminal in the Frankfurt (Oder) marshalling yard is connected to the track network of the Frankfurt (Oder) railway network. Intermodal Terminal transhipment areas and track installations are completed.<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">06.04.2005<\/p>\n<p>Inauguration of the Intermodal Terminal in the Frankfurt (Oder) marshalling yard.<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">28.02.2009<\/p>\n<p>Large areas of the marshalling yard are bought up by the City (to expand the terminal).<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\">20.09.2010<\/p>\n<p>Inauguration of the eastern track connection and handover of the newly constructed tracks at the Intermodal Terminal.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\"><span style=\"color: #000000;\">2012<\/span><\/p>\n<p><span style=\"color: #000000;\">Ground-breaking ceremony for the construction of the gantry crane and additional handling tracks <\/span><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\"><span style=\"color: #000000;\"> 2013<\/span><\/p>\n<p><span style=\"color: #000000;\">Completion of construction for\u00a0 additional handling tracks<\/span><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\n<p class=\"ueber\"><span style=\"color: #000000;\">2014<\/span><\/p>\n<p><span style=\"color: #000000;\">Construction of gantry crane<br \/>\n<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><em>Source: Eisenbahnerfreunde &#8220;Friends of the Trains&#8221; Frankfurt (Oder) <\/em>","protected":false},"excerpt":{"rendered":"<p>23.10.1842 Opening of the 81 km long single track, Berlin &#8211; Frankfurt (Oder) rail route for passenger traffic &nbsp; &nbsp; 31.10.1842 Opening of the Berlin &#8211; Frankfurt (Oder) rail route for freight transport 02.01.1857 Commissioning of the &#8220;Central Workshop,&#8217; later named Main Workshop in Frankfurt (Oder) 01.04.1910 Start of preliminary work for the construction of&#8230;<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":32,"menu_order":4,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-52","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.gvz-ffo.de\/en\/wp-json\/wp\/v2\/pages\/52","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gvz-ffo.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.gvz-ffo.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.gvz-ffo.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gvz-ffo.de\/en\/wp-json\/wp\/v2\/comments?post=52"}],"version-history":[{"count":4,"href":"https:\/\/www.gvz-ffo.de\/en\/wp-json\/wp\/v2\/pages\/52\/revisions"}],"predecessor-version":[{"id":1194,"href":"https:\/\/www.gvz-ffo.de\/en\/wp-json\/wp\/v2\/pages\/52\/revisions\/1194"}],"up":[{"embeddable":true,"href":"https:\/\/www.gvz-ffo.de\/en\/wp-json\/wp\/v2\/pages\/32"}],"wp:attachment":[{"href":"https:\/\/www.gvz-ffo.de\/en\/wp-json\/wp\/v2\/media?parent=52"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}